Move to the text
Airline ticket information
The details are>
Attic change of job _Tenshoku
Attic tours job placement Division
Network of travel agency 40 years

What's New

About <Manila metropolitan area subway plan and MRT, LRT >
2017-11-09
The pledges of the duterute government include infrastructure maintenance, but the Manila metropolitan area subway which is one of the pledges is going to be started construction of for from October to December in 2018. Some opening of 2022, whole line opening of 2025 are aimed for. LRT and MRT are operated on three lines in the Manila metropolitan area, and it is used as an everyday means of transportation now by many people. It is considerably crowded at the time of the rush like Japan and may not take it. I have you be careful about pickpockets enough in the inside of car and hold the baggage before, and it is necessary to prevent money and a cell-phone, valuables from entering the pocket. At the time of the congestion, attention in particular is necessary. In addition, the Roosevelt LRT1 line station at the north end and north avenue Station at the north end of the MRT3 line would be connected, and construction began. In this way, a railroad doing one lap of center of the Manila metropolitan area is completed. But it seems to take time before the completion as the construction completion is a plan of 2020.
Back to TOP